In September 2012, NAI J.L. Davis Realty awarded G.W. Tatro Construction the contract to upgrade seven intersections along Route 7 in St. Albans. The intersections were built in conjunction with the construction of the new Wal-Mart in town. The project consisted of widening the for new turning lanes, traffic control, relocating existing utilities, installing new storm drains, new signal intersections, as well as paving and line striping. G.W. Tatro provided several value engineer proposals to reduce the project schedule and bring the overall cost down. The project was completedĀ in time for the grand opening of the new Wal-Mart.

Project Categories: Site/Civil, Road, Highway, Rail,